Chippenham Village Website

A11 Traffic Bulletin

WC 10th March 2014:

Days:
• A11 Plant crossing operation at Chalk Hall; Monday to Friday 7am to 6pm daily, Saturday 7am to 1pm.
• A11 Plant crossing operation at Gibson’s Lodge; Monday to Friday 7am to 6pm daily, Saturday 7am to 1pm.
• B1106 two way portable traffic signals, Monday to Friday 7am to 6pm dailiy (only if required).
Nights:
• A11 north and/or southbound two way portable traffic signals various locations; Monday to Friday 7pm to 6am nightly (only if required).

WC 17th March 2014:

Days:
• A11 Plant crossing operation at Chalk Hall; Monday to Friday 7am to 6pm daily, Saturday 7am to 1pm.
• A11 Plant crossing operation at Gibson’s Lodge; Monday to Friday 7am to 6pm daily, Saturday 7am to 1pm.
• B1106 two way portable traffic signals, Monday to Friday 7am to 6pm daily (only if required).
Nights:
• A11 north and/or southbound two way portable traffic signals various locations; Monday to Friday 7pm to 6am nightly (only if required).
• 22 March – Full closure of A11 from Fiveways to B1106; The closure will be in place from 22:00 hours Saturday to 08:00 hours Sunday to install the bridge beams over the A11 for Gibson’s Bridge.  The signed diversion will be via the A1065 to Brandon then via the B1107 to Thetford, and vice versa.
• 23 March – Back up date for the above.  In the event that the weather prevents the lift taking place on the Saturday night the Sunday will be utilised.  Times and diversion will be as above.

 

 

 

Tagged in: